News
- 13.05.2019 ISO/TS 19807-2 "Nanotechnologies -- Magnetic nanomaterials -- Part 2: Specification of characteristics and measurements for nanostructured superparamagnetic beads for nucleic acid extraction
- 01.12.2016 Industrie 4.0: Deutsch-Chinesische Zusammenarbeit nimmt Fahrt auf
- 15.11.2016 Deutsch-chinesisches Seminar in Chengdu
Links
- BAM - Bundesanstalt für Materialforschung und -prüfung
- DIN Media - DIN Media GmbH
- BMWK - Bundesministerium für Wirtschaft und Klimschutz
- DIN - Deutsches Institut für Normung
- PTB - Physikalisch-Technische Bundesanstalt
Suche
DIN 2001-1
Drinking water supply from small units and non stationary plants - Part 1: Small units - Guidelines for requirements for drinking water, planning, construction, operation and maintenance of plants
DIN 1999-101
Installations for separation of light liquids - Part 101: Requirements on installations for separation for light liquids containing fatty acid methyl esters (FAME) and paraffinic fuels
DIN 2000
Central drinking water supply - Guidelines regarding requirements for drinking water, planning, construction, operation and maintenance of supply plants
DIN 1998
Placement of service conduits in public circulation areas - Guideline for planning
DIN 1999-100
Installations for separation of light liquids - Part 100: Application provisions for installations for separation of light liquids in accordance with DIN EN 858-1 and DIN EN 858-2
DIN 1988-600
Codes of practice for potable water installations - Part 600: Potable water installations in connection with fire fighting and fire protection installations
DIN 1996-18
Prüfung von Asphalt; Kugelfallversuch nach Herrmann
Testing of asphalt; Herrmann falling ball test
DIN 1989-100
Regenwassernutzungsanlagen - Teil 100: Bestimmungen in Verbindung mit DIN EN 16941-1
Rainwater harvesting systems - Part 100: Regulations in connection with DIN EN 16941-1
DIN 1988-300
Codes of practice for drinking water installations - Part 300: Pipe sizing; DVGW code of practice
DIN 1988-500
Codes of practice for drinking water installations - Part 500: Pressure boosting stations with RPM-regulated pumps





